Guidelines: No branches over 12″ in diameter Place large cuts ends facing the street Do not stack; spread branches out No firewood, construction lumber, or fence posts No roots or stumps 15 minute limit per address Materials should be curbside by 7 a.m. *Weather...
Corinne Road Paving Schedule *WEATHER PERMITTING September 17 Base Repair (road closed) Thank you for your patience.
There will be road line painting throughout the township in the coming month. Dates will be posted. Thank you for your cooperation and patience.
A seal coat will be applied to sections of Brandywine Hills starting Monday, July 7th. The roads will be blown/swept before this process starts and then swept again approximately 1-2 weeks later. This is a quick process however, it does require a lot of equipment....
In mid June, we will be starting a streambank restoration project along Pocopson Creek. Heavy equipment and construction vehicles will be entering/exiting the site from Unionville-Lenape Rd. This will require a temporary closure/detour of the trail section along the...
Please click on the links below to learn how to dispose of rechargeable and lithium batteries safely: Lithium Batteries safety flyer Rechargeable Battery Flyer